More Insulation - the second layer

Log

Day 2010/02/07

Short weekend with having been away on Saturday.

Liz had worked hard week before putting up second layer of insulation so everything was now silver. Started out by putting up hardboard ceiling but heart wasn't in it as finish was very poor. But we cut it up accurately so the templates will come in. Finished the day up by fitting two lots of ply to the rear sides.

Liz put up the blackout for the front windows which will beside the toilet, seemed to work ok, and that was that for the day.