Holes and wiring

Log

Day 2010/03/14

Busy couple of days. Finished off the cooker housing by boxing in the rear. Started to run the cables for the mains with a new hole in the floor and pulling cables through the wall. Also laid other cables to the worktop plug point and for the CBE central controller. Got the bed Liz made into position and screwed down, cut up the timber for the wardrobe and bathroom, but couldn't continue as the brackets for the joints had run out (back to screwfix for those). Liz finished up the day by putting the first batch of panelling on the end of the seat where we won't be able to reach in the future and giving it a coat of wax. Also put a few holes into the floor for the drainage etc. and dropped the fresh water tank into place.